TheTamshee: gets plenty of opportunities to see the finished offshore wind farms. The photo above gives a better insight into the foundation construction required to support the turbines on the seabed. The pre-fabricated base is transported by the Gaint 4 barge to the desired location-in this case offshore Nyborg, which is situated on the East side of Funen, Denmark. During the submerging operation in +/- 14 meters water depth. The barge ballast tanks are flooded in a controled manner. This then allows the concrete base to be lowered, positioned and secured to the seabed.
Showing posts with label Funen. Show all posts
Showing posts with label Funen. Show all posts
Tuesday, September 22, 2009
Wind Turbines Part Two
TheTamshee: gets plenty of opportunities to see the finished offshore wind farms. The photo above gives a better insight into the foundation construction required to support the turbines on the seabed. The pre-fabricated base is transported by the Gaint 4 barge to the desired location-in this case offshore Nyborg, which is situated on the East side of Funen, Denmark. During the submerging operation in +/- 14 meters water depth. The barge ballast tanks are flooded in a controled manner. This then allows the concrete base to be lowered, positioned and secured to the seabed.
Labels:
Funen,
Gaint 4 Barge,
Nyborg,
Offshore Denmark,
Wind Turbines
Subscribe to:
Posts (Atom)

